Recently, YB’s engineering and project management team conducted an on-site inspection at the construction area to review the final stage of the walkway railing installation for a pier project on the Dong Nai River.
This component plays a critical role in ensuring operational safety while also contributing to the overall structural integrity and visual completion of the project. During the site visit, the YB team carried out a detailed assessment of installation accuracy, structural stability, and alignment with related construction elements.
In parallel, strict supervision of safety standards and construction procedures was maintained to ensure the highest quality before commissioning.
With the current progress, the pier on the Dong Nai River is entering its final completion phase, preparing for handover and operation in the near future. The direct involvement of YB’s team on-site reflects a strong commitment to quality control, ensuring that every project meets the required technical and safety standards.
YB continues to affirm its position as a trusted partner in infrastructure and marine projects, driven by responsibility, precision, and attention to detail in every stage of execution.
Some photos from the working session:



中文 (中国)